A turnkey grinding workshop was installed at the Aydöküm foundry in Ankara to collect dust generated by grinding operations and improve the working environment. The project included engineering, steelwork, mechanical fabrication, piping, electrical and automation work. The system was commissioned and handed over in operating condition following performance testing and user training.
Project Information
- Project type: Turnkey plant installation
- Duration: 60 days
- Year: 2016
- Installation area: 200 m² covered area
Plant Highlights
- Jet-pulse bag filter with a capacity of 40,000 m³/h
- 8 grinding stations, each with a capacity of 5,000 m³/h
- Fabrication of steelwork and the enclosed area
- Fabrication and installation of filters, piping and dust handling equipment
- Installation of electrical systems, MCC panels and the control system
- Commissioning, performance testing and training